Monday, March 01, 2021

Move the bridge

 Roberto showed up yesterday and asked if the trail crew would move a little bridge that washed away.  When the lake came up the canal filled with water.  The foot bridge spanned the canal.  The bridge floated about sixty feet from the path it was used on.  Moving the bridge will mean it has to be pushed, pulled, or hauled about sixty feet. It will be a mini engineering feet.  Kadizzle may go to the work center today to see what we can use to move the bridge. 

Bill said no more sailing for him after the Rusty 1 turned turtle.  However, Matt say he would love to learn to sail.  Matt is like a giant version of Bill with a little meat on the bones.  With Kadizzle and Matt in the w boat it may be a lot more delicate.  The weather needs to warm up a bit so we can get on the lake.  

In the background public radio is playing.  The subject is voter suppression.  Amazing how blatant the Republicans are about their racist ways. 

No comments: